1. Made with high-quality PU (Polyurethane) outer layer for excellent durability, smooth rolling, and low noise.
2. Wheel Diameter 50 mm, compatible with most luggage models.
3. Suitable for luggage spinner wheel (single wheel) and caster wheel repairs or replacements.
4. Easy installation, ideal for DIY maintenance.
5. Suitable for a wide range of suitcases and trolley bags, providing solution to extend the lifespan of your luggage.
6. D58 and D59 wheelsets available as direct substitutes.
YEOU CHERNG Plastics Industry Co., Ltd.
Lugagge usage wheel type

1. Made with high-quality PU (Polyurethane) outer layer for excellent durability, smooth rolling, and low noise.
2. Wheel Diameter 50 mm, compatible with most luggage models.
3. Suitable for luggage spinner wheel (single wheel) and caster wheel repairs or replacements.
4. Easy installation, ideal for DIY maintenance.
5. Suitable for a wide range of suitcases and trolley bags, providing solution to extend the lifespan of your luggage.
6. D58 and D59 wheelsets available as direct substitutes.

| Dimension | |
| Unit : mm |
Diameter 50 x 14 (W1) Diameter 50 x 19 (W2) |
| Unit : inch |
Diameter 1.97 x 0.55 (W1) Diameter 1.97 x 0.75 (W2) |
| Model Number | W43 |
| Feature | 1. Made with high-quality PU (Polyurethane) outer layer for excellent durability, smooth rolling, and low noise. 2. Wheel Diameter 50 mm, compatible with most luggage models. 3. Suitable for luggage spinner wheel (single wheel) and caster wheel repairs or replacements. 4. Easy installation, ideal for DIY maintenance. 5. Suitable for a wide range of suitcases and trolley bags, providing solution to extend the lifespan of your luggage. 6. D58 and D59 wheelsets available as direct substitutes. |
| Material | PU thread |
| Color | Black |
| MOQ | Small quantity acceptable |
| Application | Luggage, Suitcase, duffle bags, travel bag, shopping cart...etc. |
| ODM/OEM | YES |


| Packaging Details | 300 PCS / CTN |
| Measurement | |
| Port | TAIWAN |
| Lead Time : 1 - 1000 | Est. Time 30 (days) |
| Lead Time : 1001 - 5000 | Est. Time 35-40 (days) |































